How much of the outer sheath should I strip back before terminating the cable?

The original installation instructions suggest stripping approximately 30mm of outer jacket to give enough working length to dress the four pairs into the IDC. That is a preparation length, not a target for leaving 30mm of loose conductors behind the finished module.

Bring the cable jacket as close to the termination area as the routing allows, keep the pair twists intact until close to their IDC positions, and let the punchdown tool trim the surplus conductor.

Answered by
Dave
Practical Support · Data Cabinets Direct
Installation & wiring 18 relevant products

More from Installation & wiring

Explore related questions about installation & wiring.

Products this answer covers

This answer applies to 18 products in the Products Using 25 x 50 mm RJ45 Data Modules range.